The Mayor, Yozajamby Molina, led the official launch of the works, accompanied by members of the Honorable City Council, representatives of civil organisations, business chambers and local residents. The project marks the beginning of a new urban development pole and addresses a historical debt to the city, allowing the acquisition of a plot of land to be urbanised with quality infrastructure.
The first stage involves the construction of 197 linear metres of asphalt road with a five-centimetre-thick asphalt layer and a total width of 14 metres. The project includes four lanes of traffic, two in each direction, starting from Santos Degollado Boulevard towards the local stream. It also includes the installation of 26 high-efficiency solar lights, 57 metres of 15-inch PEAD pipe for drainage, three inspection wells, two culverts for storm water crossings and road signage.
The mayor emphasised that this access road represents only the first stage of an ambitious mobility corridor that, in subsequent phases, will connect Santos Degollado Boulevard directly with the Magallanes highway. The impact of the new arterial road will transform the daily mobility of students, athletes and families, providing efficient access to the High School, the South Sports Complex, the Pet Welfare Clinic and nearby neighbourhoods such as Las Fuentes and Corral de Piedra.




